Introducing the new look BMSI. Read about it here.

Energy Reduction Toolkit For Finance Teams In Education

Download our energy reduction toolkit where we share some simple initiatives to help schools and education organisations reduce energy consumption and save on bills.

About BMSI

We Help Education Establishments Reduce Their Energy Consumption

BMSI are the UK’s largest and leading independent Building Management Systems Integrator.  Formed in 1998, we have over 30 years experience of supporting Primary, Secondary, Further and Higher Education establishments across the U.K. in managing their facilities to provide an environment that is conducive to learning, but in as energy efficient manner as possible.

We have a track record of reducing the energy consumption of our customers within education through:

Energy Monitoring

Provision of energy monitoring equipment, software, analysis and reporting to identify areas of energy consumption for further investigation or remedial action.

BMS Installation

Provision of Building management systems to meet the needs of these energy profiles, but also ensure energy efficiency in what are incredibly dynamic buildings / operations.

BMS Maintenance

Provision of maintenance, management, energy efficiency software for the BMS to ensure that it is running to the exact needs of the school.

Our Aim

Why have we created the Energy Reduction Toolkit for Education?

Schools are underfunded, and facing increasing energy bills, as a business that specialises in the reduction of energy consumption, we feel a duty to share some simple initiatives that might help ease this burden.

Our team have surveyed dozens of schools each year and the common theme among all of them is that there are multiple opportunities for no cost or low cost initiatives that can help reduce energy consumption and the corresponding bills.

Once you have exhausted these approaches then we will be in a great position to potentially help you achieve further reductions and add real value to your organisation through our specialisms within  Energy Management and Building Management Systems.

Formally owned by Centrica, BMSI was purchased by BESG in 2017.

BESG is funded by individual private investors, all of whom have a successful track record in the BMS industry.

Since 2017 BMSI has grown organically from 135 employees to 198 employees.

Turn over has risen from £18.5 million in 2017 to £31 million in 2023.

Download The Full Energy Reduction Toolkit for Finance Teams in Education

Learn the right questions to ask to understand more about your energy usage
Understand how to engage the key stakeholders
Learn how to ensure your plant is well controlled
Get top tips on how to prepare for the holidays and seasonal variations
Understand what your true operational hours really are
Advice on how to involve your students in the energy reduction process
Please enter your details to download the full toolkit:
Thank you! Your submission has been received!
Download the Toolkit
Oops! Something went wrong while submitting the form.
01
Design

Engineering design & building management

Engineering teams work to BS EN ISO 9001 standards and will produce an information pack, meeting the design criteria of both architects and consulting engineers.

CAD production of engineering drawings means that information is presented consistently. We also write our own turnkey software to program hardware from several major suppliers, in line with individual specifications.

Take charge of your building today
02
Installation

Motor control centre manufacture

Motor Control Centres (MCC) to Form 2, 3 and 4 are manufactured using branded components. MCCs are assembled and wired within the enclosures to pre-approved designs. Fault rated busbar systems, are assembled to an ASTA Certified System, using high conductivity copper, and are matched to withstand the calculated pressure at each MCC.

Each MCC is thoroughly tested, with each circuit connected to a simulation test rig to check compatibility with control software programs and temperature control devices. Prior to despatch from the workshop, a 2,000-volt flash test and 500-volt insulation test is carried out to ensure that the MCC complies with Electrical Safety regulations.

Make informed decisions

Interested in reducing energy consumption at your school?

Get in touch with our team today to learn more about how BMSI can help your education organisation reduce energy consumption, save on energy costs, and achieve your environmental goals.

Our Web-Based Energy Management Platform
Recent Projects

We combine service excellence with tailored solutions to deliver real value for our clients

Blog

Recent News

5 min read
December 23, 2024

BMSI’s Regional Administrators Meeting

Full of commitment and drive, our Regional Administrators work tirelessly behind the scenes to keep our business operations running smoothly. 
5 min read
December 17, 2024

BMSI’s Wales and South West Regional Support Meeting

At BMSI, we firmly believe that a strong and connected team is the foundation of our ability to deliver exceptional service to our clients.
5 min read
November 14, 2024

BMSI’s Q3 Managers Meeting 2024

We’re big believers in the fact that a strong, positive company culture is the foundation for success, which is why we dedicated our recent Q3 Regional Managers Meeting to the theme of "Culture in the Workplace."